Sherman Hill: the first Rocky Mountain railroad pass - Trains (2024)

By James Ehernberger | September 24, 2021

| Last updated on May 9, 2023

Sherman Hill marks one of the higher elevation mountain passes in the western U.S.

Sherman Hill is one of the landmarks on the transcontinental railroad. It was the first major obstacle for the railroad as it headed west. It’s the highest point on the first transcontinental railroad with the original summit topping out at 8,247 feet above sea level. A 1901 line change shaved over 200 feet off the summit, bringing it down to 8,015 feet. There were a few passes that crossed the mountains at a higher elevation, but the majority of passes in the West measured out at around 7,500 feet and down. There is no doubt Sherman Hill is a formidable obstacle, yet at the same time it is among of the easier rail crossings of the Rocky Mountains. Today, it’s one of the busiest main lines in North America.

Sherman Hill history

Gen. Grenville Dodge was scouting a route for the UP mainline in 1867 and, while running away from an indigenous patrol, he came upon a rise and discovered the future Sherman Hill route west from Cheyenne, Wyoming. While it was impossible to maintain the desired grade, this route was the best one, and was not considered excessive.

Native Americans did their best to oppose the railroad with ultimately unsuccessful guerilla warfare.

Construction of the UP continued westward from Cheyenne, and by the end of 1867, the end of track had reached Granite Canon, 19 miles from Cheyenne. Here, construction became more difficult. The highest and longest earthen fill was built during the winter months of 1867 and 1868. This work required manpower and mules, hand tools, wagons and carts, and blasting powder.

Tracklayers worked westward to Sherman station, at what was then the highest railroad station in the world at 8,247 feet. Dodge bestowed the name Sherman in honor of Civil War Gen. William Tec*mseh Sherman.

Dale Creek ravine, about 3 miles beyond Sherman, was the second major obstacle on Sherman Hill. A huge trestle, 650 feet long and 126 feet high, was built during winter 1867-1868, using timbers from Chicago. Dale City was located at the bridge construction site and included a short-lived post office. As soon as track was installed on the bridge, workers pushed westward. A bridge at Dale Creek remained until 1901.

Sherman Hill grades (up to 1.92 percent), as originally constructed, required the use of helper locomotives on most all trains. But gravity was only one problem. Snow was a major issue in the early days, due to the narrow cuts made during the line’s hasty construction. At one time, 13 snow sheds lined the route between Archer (9 miles east of Cheyenne) and Laramie. The sheds became a hazard for trainmen riding the top of cars. Many sheds were destroyed when a hot cinder lodged in the dry timbers and fanned in the wind. Over time the cuts were widened, and the remaining sheds removed one by one prior to 1900.

Sherman Hill: In the Harriman era

Edward H. Harriman was among a number of investors who bought out the insolvent-Union Pacific’s mainline through a government auction in 1897. Harriman became the railroad’s leader and had a keen eye toward making it profitable.

Major changes shortened the distance between Omaha and Ogden, Utah, by more than 40 miles, doing away with excessive curvature and steep grades. Across the system, existing grades were raised to a higher standard, and hundreds of trestles were filled in. These improvements eliminated potential fire hazards and expensive maintenance.

One major project was between Cheyenne and Laramie. Survey crews determined a new route west of Buford to Laramie was possible by building a tunnel, passing Sherman and lowering the elevation by 247 feet. Grading required numerous high fills to cross deep ravines. West of Buford, Lone Tree fill was 130 feet high and 300 feet long. The largest fill, 115 feet high and 800 feet long, was at Dale Creek, about 3 miles from the infamous bridge. A 3-foot-gauge construction railroad moved dirt and rock onto trestles to be dumped. Seventeen steam shovels worked the project.

The line change to ease the grade between Buford and Laramie also involved the construction of a single-bore, 1,800-foot tunnel. The approaches required making a deep cut on the east end and heavy rock work on the west end. The new line, which increased mileage by less than half a mile, was placed in service in June 1901.

Sherman Hill: new line east from Laramie

Civil engineers located an easier grade east from Laramie and built a second main in 1901. This alignment gradually passed close to the base of the Sherman Mountains. It was about 3 miles East of Red Buttes, at a new station named Colores. This obtained the desired 0.8% grade, compared to the heavy 1.92% climb eastward from Red Buttes on the original route. The railroad stopped using helpers on eastbound trains.

Double tracking was a massive undertaking for the UP. Certain areas were favored due to operating conditions and for eliminating congestion. A second bore at Hermosa Tunnel was placed into service in 1918. This provided UP with a second main line between Omaha and Ogden, with one exception.

The Aspen Tunnel section in western Wyoming remained a single-track bottleneck. In 1947, the UP authorized construction of the adjacent 6,700-foot Altamont tunnel and additional tracks that would completely double track the main line between Council Bluffs, Iowa, and Salt Lake City, Utah. The $8 million project was placed into service in 1949.

Sherman Hill: Harriman line

After years of being satisfied with its main line across Wyoming, UP officials in 1951 revisited Sherman Hill and its difficult grades. The purpose was to seek a route that would eliminate the 1.55% maximum grade between Cheyenne and Buford and the need for helper locomotives. The only way to obtain a westward grade of 0.8 percent was to add mileage. The result was a new line that was 9 miles longer than the Buford route. The $16 million Harriman line went into service on May 24, 1953, and 50 enginemen were promptly laid off.

All lines over Sherman Hill between Cheyenne and Laramie were placed under Centralized Traffic Control in 1953. The Cheyenne train dispatcher originally controlled movements. The new Harriman Dispatch Center at Omaha replaced the Cheyenne office in 1989. The operation has flexibility so that trains can operate in any direction on all three main tracks. Today, only the short segment through the Hermosa Tunnels is double tracked over Sherman Hill; all the rest is triple tracked.

[CLICK ON MAP TO ENLARGE.]

Sherman Hill: the first Rocky Mountain railroad pass - Trains (2024)

References

Top Articles
Fidelis von Sigmaringen
Touching Incidents and Remarkable Answers to Prayer - Christian Classics Ethereal Library
Sarah F. Tebbens | people.wright.edu
Jesse Mckinzie Auctioneer
Oppenheimer & Co. Inc. Buys Shares of 798,472 AST SpaceMobile, Inc. (NASDAQ:ASTS)
Bernie Platt, former Cherry Hill mayor and funeral home magnate, has died at 90
Newgate Honda
Alaska: Lockruf der Wildnis
TS-Optics ToupTek Color Astro Camera 2600CP Sony IMX571 Sensor D=28.3 mm-TS2600CP
Rhinotimes
Baywatch 2017 123Movies
Enterprise Car Sales Jacksonville Used Cars
Gem City Surgeons Miami Valley South
Sonic Fan Games Hq
Transfer and Pay with Wells Fargo Online®
Elemental Showtimes Near Cinemark Flint West 14
Kp Nurse Scholars
Abby's Caribbean Cafe
H12 Weidian
Cocaine Bear Showtimes Near Regal Opry Mills
Mychart Anmed Health Login
Teacup Yorkie For Sale Up To $400 In South Carolina
Dr Ayad Alsaadi
Bn9 Weather Radar
Avatar: The Way Of Water Showtimes Near Maya Pittsburg Cinemas
Timeline of the September 11 Attacks
Is Holly Warlick Married To Susan Patton
Cars & Trucks - By Owner near Kissimmee, FL - craigslist
Tottenham Blog Aggregator
Kristy Ann Spillane
Meowiarty Puzzle
Inmate Search Disclaimer – Sheriff
How to Draw a Bubble Letter M in 5 Easy Steps
Solve 100000div3= | Microsoft Math Solver
Dallas City Council Agenda
Boggle BrainBusters: Find 7 States | BOOMER Magazine
Merkantilismus – Staatslexikon
Oxford House Peoria Il
Gotrax Scooter Error Code E2
Pulaski County Ky Mugshots Busted Newspaper
Garland County Mugshots Today
Autozone Battery Hold Down
Avatar: The Way Of Water Showtimes Near Jasper 8 Theatres
Mauston O'reilly's
Zeeks Pizza Calories
Nearest Wintrust Bank
Ajpw Sugar Glider Worth
Craigslist Marshfield Mo
Bama Rush Is Back! Here Are the 15 Most Outrageous Sorority Houses on the Row
Skyward Login Wylie Isd
Buildapc Deals
Unit 4 + 2 - Concrete and Clay: The Complete Recordings 1964-1969 - Album Review
Latest Posts
Article information

Author: Kieth Sipes

Last Updated:

Views: 6159

Rating: 4.7 / 5 (67 voted)

Reviews: 82% of readers found this page helpful

Author information

Name: Kieth Sipes

Birthday: 2001-04-14

Address: Suite 492 62479 Champlin Loop, South Catrice, MS 57271

Phone: +9663362133320

Job: District Sales Analyst

Hobby: Digital arts, Dance, Ghost hunting, Worldbuilding, Kayaking, Table tennis, 3D printing

Introduction: My name is Kieth Sipes, I am a zany, rich, courageous, powerful, faithful, jolly, excited person who loves writing and wants to share my knowledge and understanding with you.